Piggush Engineering worked with Kankakee Community College on the construction of a new dumpster pad. Due to the location of the existing dumpster pad, the dumpster would need to be moved to allow access for incoming deliveries.  Site engineering design included determining a new location for the dumpster pad that would allow access to the loading dock as well as designing around existing electric feed and the transformer that served the existing building. This project was done in conjunction with the loading dock site improvement, which needed to be completed quickly to minimize downtime to their loading dock. This project was completed on time and under budget.